Gariahat Flyover
The Gariahat Flyover project was completed in 30 months and is
open to traffic in Kolkata. The 571.06-metre long flyover, the
foundation stone of which was laid in 1999, is part of the
four flyover projects, under the Rs 400-crore Calcutta
Transport Infrastructure Development Projects. The Japanese
Bank for International Co-operation is funding the project.
|
Carries |
4 General purpose lanes |
 |
|
Crosses |
Gariahat Crossing |
|
Longest span |
571.06 Mts |
|
Total length |
571.06 Mts |
|
Width |
18 metres (60 ft) |
|
Clearance
below |
26 metres (85 ft) |
|
Opening date |
14th April, 2002 |
| |
|
|